Deutz 1012 Spécifications Page 34

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 282
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 33
Page 26
Section 4.1
Service Training
09.06
SETTING OF INJECTORS
For a correction of the opening pressure:
- Remove injector from nozzle tester 8008. Remove
tensioning nut and uninstall all components. Use dolly
110 110 for the injector.
Sequence of parts disassembly and re-assembly
1. Tensioning nut
2. Nozzle
3. Adapter
4. Thrust pin
5. Compression spring
6. Shim
- Adjust opening pressure by selecting appropriate shim.
A thicker shim will increase the opening pressure. Re-
assemble injector. Tighten tensioning nut.
Specified tightening torque: 30 - 40 Nm
- Check injector on nozzle tester 8008 once again.
Vue de la page 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 281 282

Commentaires sur ces manuels

Pas de commentaire