Servicing and maintenance works Fuel system
36 © 2008
6
Specifications when working on the fuel system
Engine must be switched off!
Smoking and naked lights prohibited!
No injection/high pressure pipes may be
disconnected while the engine is running.
Caution when handling hot fuel!
Pay attention to utmost cleanliness when
refuelling and working on the fuel system.
Clean the respective affected parts careful-
ly. Blow damp areas dry with compressed
air.
Observe the safety regulations and nation-
al specifications for handling fuels.
Dispose of leaking fuel and filter elements
properly. Do not allow fuel to seep away
into the ground.
After all work on the fuel system, the sys-
tem should be vented, a trial run performed
and the tightness checked.
It will be necessary to vent the fuel system
when commissioning for the first time, after
maintenance work or if the tank has been
run dry.
Additional venting of the fuel system by a 5
minute trial run at idle speed or on low load
is absolutely essential.
Pay attention to utmost cleanliness due to
the high production accuracy of the system!
The fuel system must be tight and closed.
Make a visual inspection for leaks/damage
in the system.
Clean and dry the engine and engine com-
partment thoroughly before beginning
work.
Areas of the engine compartment from
which dirt could be loosened must be cov-
ered with a fresh, clean foil.
Work on the fuel system may only be car-
ried out in an absolutely clean environment.
Air contamination such as dirt, dust, mois-
ture etc. must be avoided.